Work on the pitch

In addition to the day-to-day work of looking after and caring for the pitch, the following is planned:

From July 1 to July 31

  • Grass weeding of fairways
  • Robotic mowing of the driving range
  • Thistles between the 3rd tee and hole 5 are removed
  • Grass trials are started. Test areas marked with yellow plates and blue spray on holes 12, 18, 6 and 7.
  • Completion of holiday.

From 1 June to 30 June

  • Repair of putting green
  • Cut hedges
  • Grass weeding of fairways
  • Greens:
    • quick dotted
    • Vertical cut
    • Sown later
    • The top dress

From May 1 to May 31

  • Reseeding after winter damage
  • Preparation and start-up of the ball machine
  • Prick, sow and dress greens and tees with sand
  • Extension of transition on hole 13

From 1 April to 30 April 

  • Godly greens, tees and fairways
  • Start-up of irrigation systems
  • Renovation of ball pit
  • Drainage well in grass piles on hole 3

From 1 January to 31 March

  • Trimming fences
  • Cleaning of lake at tee 43 hole 14
  • Pump water away
  • Check lane markings
  • Get ready for track opening
  • Grind knives for the mowers
  • Vertical cutting of greens
  • Grooming of fairways
  • Lay out summer mats on the driving range